With new construction on the horizon, the Shift program is dedicated to providing you with up-to-date information about the major projects bringing new amenities and resources to your neighborhood. Please note, construction schedules are subject to change. To confirm the information below and other work schedules, contact Shift at 844-SHIFT-SD.

Visit ShiftSanDiego.com or follow @ShiftSanDiego on Twitter for continuous updates on construction information that may impact your neighborhood.

 

Mid-Coast Trolley Construction, SANDAG Project

Trolley Overcrossing, south of Nobel Drive
This March, overnight full closures of Interstate 5 (I-5) are scheduled for crews to remove falsework—or temporary support structures—from the section of the Trolley bridge that crosses over the freeway just south of Nobel Drive. Full closures of northbound I-5, from State Route 52 (SR 52) to Genesee Avenue, began on Monday, March 2 and will continue through Thursday, March 5. Full closures of southbound I-5, from the I-5/I-805 Interchange to Gilman Drive/La Jolla Colony Drive, are scheduled to begin on Sunday, March 8 and will continue through Thursday, March 12. All closures will be in effect from 9:30 p.m. to 5 a.m. each night. Timing and closures are subject to change. Visit ShiftSanDiego.com for more details.

Falsework removal at the Trolley overcrossing south of Nobel Drive

Genesee Avenue
Overnight partial and full closures of Genesee Avenue are tentatively scheduled for late April. During the closures, crews will be removing falsework from the Trolley bridge at the future UTC Trolley Station. Traffic controls and detour routes will be in place. Additional details will be posted to ShiftSanDiego.com in advance of the closures.

Aerial view of the future UTC Trolley Station
For more information on the Mid-Coast Trolley project, including a map, detours and what to expect, visit KeepSanDiegoMoving.com/MidCoastTrolley, Facebook.com/MidCoastTrolley or @ShiftSanDiego on Twitter.
 

Westbound SR 52 to Northbound I-5 Freeway Auxiliary Lane, Caltrans Project 

A new auxiliary lane is being constructed to connect the westbound SR 52 to northbound I-5 freeway connector to the La Jolla Colony Drive off-ramp. Work along the shoulder has been completed and contractors are currently working to install drainage inlets and concrete barriers on site. Crews will continue to place signage when the freeway connector is closed to alert drivers and indicate recommended detours.

 

North Torrey Pines Living and Learning Neighborhood, UC San Diego Project

Construction is well underway at the North Torrey Pines Living and Learning Neighborhood with new student housing expected to be move-in ready by fall 2020. A closure of Muir College Drive is scheduled to run through late August to accommodate ongoing work. The project also will include the replacement of two traffic signal heads to add right-hand turn arrows and LED safety lights at the intersection of Genesee Avenue and North Torrey Pines Road.

 

Mesa Housing Pedestrian and Bike Bridge, UC San Diego Project 

The ribbon cutting for the Mesa Housing Pedestrian and Bike Bridge was held on Feb. 25. The bridge provides a direct route for pedestrians and bicyclists between Mesa Housing, East Campus Medical Center and the Main Campus and will improve mobility for residents, students and staff. In early March, full road closures will be in place to reseal and stripe Medical Center Drive South. There also will be light impacts to the shoulder and sidewalks on Medical Center Drive South. Visit ShiftSanDiego.com for more details.

 
Let us know what projects you’re most interested in receiving information about via email at info@ShiftSanDiego.com or phone at 1-844-SHIFT-SD. Visit ShiftSanDiego.com to sign up for email alerts about major construction updates and access the map of all the ongoing projects.
 
The Shift San Diego Team
 

For information about this work and other construction schedules call Shift at 844-SHIFT-SD. For additional information about the Mid-Coast Trolley project call (877) 379-0110, email midcoast@sandag.org, or visit KeepSanDiegoMoving.com/MidCoast.

Si desea obtener información en español, por favor comuníquese al (619) 699-1950 o pio@sandag.org.

In compliance with the Americans with Disabilities Act (ADA), this document is available in alternate formats by contacting the SANDAG ADA Coordinator, the Director of Diversity and Equity, at (619) 699-1900 or (619) 699 -1904 (TTY).

About Shift

The Shift program, formed by the San Diego Association of Governments, is designed to provide residents, businesses and commuters impacted by construction in University City and La Jolla with information and resources to minimize disruption, confusion and potential traffic challenges, as well as provide transportation solutions. For more information, visit ShiftSanDiego.com. To view other possible closures or impacts in the area, visit the construction notices section of Shift. Sign up for text alerts to receive notices for major construction and impacts by texting “ShiftSD” to 797979 and check out Shift’s commuter resources to help you get around the construction.

 
Copyright © *|CURRENT_YEAR|* *|LIST:COMPANY|*, All rights reserved.
*|IFNOT:ARCHIVE_PAGE|* *|LIST:DESCRIPTION|*

Our mailing address is:
*|HTML:LIST_ADDRESS_HTML|* *|END:IF|*

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.

*|IF:REWARDS|* *|HTML:REWARDS|* *|END:IF|*